Gema - an ultra modern production site
The collaboration between Gema Switzerland GmbH and Hager in the construction of the new site in Gossau embodies technical excellence and innovation in energy distribution.
Adapting Solutions to the Specifics of Each Site...
One of the major challenges lay in optimizing space without sacrificing the reliability of the energy supply. The unibar H cable tray system enabled faster installation than traditional wiring while occupying less space. This solution was complemented by unibar M for lighter capacities, ensuring maximum flexibility in areas with restricted access.
Hager's long-term vision is reflected in its ability to integrate modular and scalable systems that can adapt to the changing needs of its clients. The uniway socket system, designed to be quickly adjusted and upgraded without interrupting operations or requiring personal protective equipment, facilitates future modifications, while its universal adapters ensure easy integration of new components.
...to Meet the Needs of Every Space.
Finally, for offices and meeting rooms, the BKG floor ducts and leveling floor cassettes ensure effective cable management while offering maximum flexibility for power supply and data connections.